Operations Snape branch line
the rail entrance snape maltings
in later years snape working bonus working operated ipswich engine shed drivers workings carried out possible (in order qualify bonus?).
signalling 1 engine in steam train staff 1873 changed train staff , train ticket method of operation. in 1892 original method of operation re-introduced. small hut provided signal box @ snape replaced small signal box c1892. lasted until 1943 when points etc. controlled ground frame , box demolished. snape junction signal box closed in december 1960.
Comments
Post a Comment